3.3 MW Polish Hydropower Plant Kosciuszko Commissioned with Three Kaplan Turbines
Benešov, Czech Republic – 21 May 2003. Mavel a.s., a Czech engineering and manufacturing company for small hydroelectric power plants, announced the successful commissioning of the 3.3 MW Kosciuszko hydro-electric power plant located on the Wisla River near Krakow, Poland. The new plant was completed at the end of April and has installed power of 3.3 MW using a water flow 100 m3/s.